Solar Check SheetInstaller's Name* Company Name* Client's Name* Job Number* Is the client receiving a GEM?* Yes No Before leaving for the job:Did you collect required gear from workshop or depot?* Yes No Are there comments/issues regarding gear? Yes No Issues or Comments?Were all components delivered as per delivery note?* Yes No Are there comments/issues regarding delivery? Yes No Issues or Comments?Do you have all the relevant paperwork?* Yes No Are there comments/issues regarding paperwork? Yes No Issues or Comments?Did you check all safety gear is in good condition?* Yes No Are there comments/issues regarding safety gear? Yes No Issues or Comments?Are all accreditations up to date?* Yes No Are there comments/issues regarding accreditations? Yes No Issues or Comments?Do you have all safety gear with you for installation?* Yes No Are there comments/issues regarding missing safety gear? Yes No Issues or Comments?Has the customer been contacted by your team the day prior, to advise of time/day?* Yes No Are there comments/issues regarding contacting the client? Yes No Issues or Comments?Arriving at the job:Did you greet the homeowners and explain the full extent of the Job (Max. 1 hour)?* Yes No Are there comments/issues regarding greeting the householders? Yes No Greeting IssuesHave you got prior approval from the customer for locations for the following, and have you shown them actual components?Untitled* Solar Panels Inverter DC and AC Isolators Controllers if applicable Batteries if applicable Are there comments/issues regarding locations of any of the components? Yes No location issuesDid you discuss requirements for the conduit on surfaces within and outside the home?* Yes No Are there comments/issues regarding the use of conduites? Yes No Greeting IssuesHealth and safety checksHave you completed the following health and safety checks?safety list* Completed the JSEA form before commencing work? Completed required remedial work to mitigate risks identified? Set up all anchor points on the roof in accordance with the training received and secured harness ensuring safety while working at heights? Removed any materials, equipment or tools not being used that could create a fall hazard? Installed solar panels and frames with care to ensure no damage is caused to any area of the roof or house? Remedial WorkAre there comments/issues health and safety checks?* Yes No Comments on health and safety checks* InstallationOn completion of the installation have you:* Run DC cable in conduit to inverter? Run cable from inverter to switchboard? Installed isolation switches where required? Installed required switchgear in switchboard? Ensured that screws were put back in roof iron and all areas are watertight? (if applicable) Used a blower to remove any debris? Liaised with electrical inspector for time required on site? Are there comments/issues regarding the installation?* Yes No Installation comments/issues*InspectionUpload COC here: Drop files here or Select files Accepted file types: jpg, png, pdf, doc, docx, Max. file size: 50 MB, Max. files: 10. Did you have to phase load?* Yes No What appliances were loaded onto the solar phase?* Stove Fridge Hot Water Water Pump Kitchen Laundry Lights Spa Pool Electric Car Charging Other If 'other' please specify Did you install a battery?* Yes No What appliances were loaded onto the solar phase?* Whole home Partial home Post InstallationAttach photos of the roof pre installation: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of the panels post installation (try to get some for social media too): Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos underside of panels showing space between panel and roof: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos inverter showing isolators and location: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of inverter serial and dongle numbers: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of the inverter screen operating: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of all electrical boards with labels: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of controller (if applicable): Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of battery (if applicable): Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of the test sheet: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Attach photos of the wiring diagram: Drop files here or Select files Accepted file types: jpg, png, Max. file size: 50 MB, Max. files: 10. Did you commission the solar system and inverter?* Yes No Are there any issues/comments regarding commissioning the system?* Yes No Commission commentsDid you set up the inverter app on the customer's phone and/or computer, and show them how to use it?* Yes No Are there any issues/comments regarding setting up the app?* Yes No App comments*Did you show the customer what the app is telling them*e.g. Production is what they are producing and ignore the rest of the data. Yes No Are there any issues/comments regarding setting up the app?* Yes No App demonstration comments*Have you told the customer a GEM can take 1 to 2 weeks to commission?* Yes No Have you told the customer a GEM can take 1 to 2 weeks to commission?* Yes No GEM commissioning issues/comments*Did you follow the helioscope or make amendments onsite? Yes No Are there any issues/comments regarding helioscope/ammendments?* Yes No Helioscope or ammendment issues/comments*Is there and shading of the panels?* Yes No Are there any issues/comments regarding shading of panels?* Yes No Shading issues/commentsGeneral feedback for EcoefficientDo you have any feedback for Ecoefficient on this job?We are looking for any information that will improve the experience for our customers or make the installation process easier for you the installer. Any observations or comments will be welcome.